Crestwood logoPublic Works

 

 

Mission

The department's services include street maintenance, water distribution, sewer collection, and snow removal. The department also oversees the village's recycling program and issues permits for construction and demolition projects. The Crestwood Public Works Department is committed to providing quality services to the residents of Crestwood and strives to create a safe and livable community.

Crestwood’s Public Works Department has been extremely busy these days. Along with the day-to-day activities involved in keeping our Village beautiful and running smoothly; Public Works is engaged around the Village assisting in Community Development, Capital Improvement projects, and the current remodel of several buildings the Village has purchased. The remodeling projects include the new buildings for Crestwood Village Hall and the Civic Center.

*Forms/Applications and Management located at Village Hall*

Online Reporting with Crestwood’s FrontLine Portal

 

 Crestwood’s FrontLine Portal can be used fill out a “Condition Report” to report the following;

  • Unsafe road conditions and issues such as potholes, fallen trees or tree limbs in street, flooding or animal carcasses on roadways.
  • Issues with Street and Traffic Signage
  • Issues with Light Poles, Street Lights and Traffic Signals

Contact Us

Bill Graffeo

Director

Address: 14040 Kildare Ave, Crestwood, IL 60418

Phone(708) 371-4800 ext. 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Village Facebook page

 

NEWS

Crestwood & Midlothian Join Together to Alleviate Chronic Flooding

The Village of Crestwood, in partnership with the Village of Midlothian, will host a Public Information Event on Tuesday, April 28, 2026, at 6:30 pm at the Crestwood Civic Center to share information about the Crestwood/Midlothian Flood Mitigation Project, a major effort to reduce chronic flooding. The project will focus on the area bound by Midlothian Turnpike (north), 147th Street (south), Lamon Avenue (east) and Central Avenue (west). Studies by Crestwood, Midlothian, and Bremen Township confirmed recurring flooding affecting homeowners, a local church, and major roadways such as the heavily traveled Midlothian Turnpike. These studies resulted in eleven targeted drainage improvements across seven locations designed to lower water surface elevations, improve stormwater flow and storage, and strengthen the watershed’s resilience to future flooding.

The Villages of Crestwood and Midlothian have entered into an Agreement with the Metropolitan Water Reclamation District of Greater Chicago (MWRD) for vital funding to advance this project, which requires easements, land acquisition, and coordination among several agencies. Construction will occur in two phases that include stream?flow improvements, new and reconstructed detention basins, culvert upgrades, streambank stabilization, and additional stormwater storage. At this time, construction is scheduled to begin in Winter 2027.

Residents are invited to learn more at this event at the Crestwood Civic Center, 13820 S. Cicero Avenue from 6:30 to 8:30 pm on April 28, 2026. Crestwood and Midlothian staff, along with the project engineers, will be available to answer questions and discuss anticipated benefits for the community.